Real deployments. Real results.
Active deployment
Pilot Deployment: University Campus
Across 15 assets in 2 facilities, Terralyn identified three compound failure risks the facilities team didn't know they had — involving chillers, backup generators, and storm drainage systems.
2
Facilities
15
Assets monitored
3
Critical risks caught
90
Day deployment
What Terralyn found:
RISK 1
Chiller system at 115% of expected lifecycle — compound risk from age + weather exposure
RISK 2
Backup generator with drainage dependency — single storm event could cascade to campus-wide outage
RISK 3
Boiler system with deferred maintenance creating hidden risk multiplier across connected systems
More case studies coming as deployments scale. Want to be our next?